Line 4: Line 4:
  
 Some details on [[ge:diesel generators]], terminology, factors to consider, and recommended features.  Some details on [[ge:diesel generators]], terminology, factors to consider, and recommended features. 
 +  * [[ge:diesel-generators|Diesel Generators]]
 +  * [[ge:prime-vs-standby|Prime Power vs Standby Power Ratings]]
 +  * [[ge:heaters|Generator Heater Design]]
 +  * [[ge:standby|Generator Standby ]]
  
 The diesel generator sets for this sample project are sized for 30kw continuous/baseload, or 38kw [[ge:prime-vs-standby|prime power]]. The [[cp:start|Control System]] will automatically start a second generator if the first generator reaches 80% of its capacity, synchronize and operate them in parallel. When the load drops below 70% of the single genset capacity it will automatically unload and cool down the second genset. If the running generator shuts down due to a fault the second generator will automatically start and carry the load; if possible (in the case of a critical warning, like high water temperature or low coolant) the load will be transferred automatically before shut down.  The diesel generator sets for this sample project are sized for 30kw continuous/baseload, or 38kw [[ge:prime-vs-standby|prime power]]. The [[cp:start|Control System]] will automatically start a second generator if the first generator reaches 80% of its capacity, synchronize and operate them in parallel. When the load drops below 70% of the single genset capacity it will automatically unload and cool down the second genset. If the running generator shuts down due to a fault the second generator will automatically start and carry the load; if possible (in the case of a critical warning, like high water temperature or low coolant) the load will be transferred automatically before shut down. 